30+
Projects Developed
Across India, Africa & Europe
6-9
Months Development Time
From site ID to RTB
1,500+
Acres Secured
For solar development
98%
Permit Success Rate
First-time approvals
Why Development Matters
Development is where projects succeed or fail. In India alone, over 40% of solar projects face land title disputes, permit delays, or grid connectivity issues that erode returns and extend timelines by 12-18 months.
Soleos absorbs all development risk internally. Our in-house teams handle site selection, land aggregation, regulatory approvals, grid connectivity, and offtake structuring—delivering shovel-ready projects where investors and consumers enter at the construction stage with all risks eliminated.
The result: 6-9 months from greenfield to construction-ready, compared to the industry average of 18-24 months.
Development Process
6 Phases to Shovel-Ready
Our systematic approach compresses development timelines while eliminating risk at every stage.
Site Identification & Selection
Scientific site selection using advanced analytics and ground verification.
Key Activities
- GIS-based solar irradiance mapping (>5.5 kWh/m²/day threshold)
- Satellite imagery analysis for terrain and access
- Proximity analysis to grid infrastructure (<10km preferred)
- Topographical survey and soil assessment
- Stakeholder and community engagement
Land Acquisition & Title Verification
Rigorous due diligence to eliminate title risk completely.
Key Activities
- 30-year retrospective title search at Tehsil level
- Revenue record verification (7/12, 8A, mutation entries)
- Encumbrance certificate from Sub-Registrar
- Multi-layer ownership validation for fragmented holdings
- Lease structuring with registration and stamp duty
Grid Feasibility & Interconnection
Early engagement with transmission utilities to secure injection capacity.
Key Activities
- STU/CTU connectivity application and pre-approval
- Injection capacity reservation at nearest substation
- Transmission corridor assessment and planning
- Grid stability and power quality analysis
- Bay allocation and metering arrangements
Regulatory & Environmental Approvals
Parallel processing of all permits to compress timelines.
Key Activities
- CLU (Change of Land Use) from Revenue Department
- CEIG (Chief Electrical Inspector) approval
- Environmental clearance (EIA screening)
- Forest clearance (FC-I/FC-II if applicable)
- State-specific generation licenses and registrations
Offtake Structuring
Bankable power purchase agreements with creditworthy offtakers.
Key Activities
- PPA negotiation with C&I consumers or DISCOMs
- Tariff optimization and escalation structuring
- Payment security mechanisms (LC, escrow, guarantee)
- Scheduling and forecasting obligations
- Bankability review with lender panel
Ready-to-Build Handover
Complete project package ready for investor entry and construction.
Key Activities
- Comprehensive documentation and data room
- Technical due diligence package (LDTE, IE report)
- Legal due diligence completion certificate
- Pre-approved financing from lender panel
- Construction-ready with mobilization timeline
Our Capabilities
Built-In Development Infrastructure
In-house capabilities that eliminate external dependencies and accelerate timelines.
In-house Land Team
25+ professionals across India specializing in land aggregation, title verification, and lease structuring.
Regulatory Expertise
Active presence in 12+ states with established relationships with STUs, DISCOMs, and regulatory authorities.
Legal Framework
Panel of 15+ law firms for title opinions, contract drafting, and dispute resolution across jurisdictions.
Technical Validation
PE-stamped designs, third-party engineering reviews, and bankability assessments for every project.
Risk Mitigation
How We Eliminate Development Risk
Every common development pitfall has a Soleos solution built into our process.
| Risk | Industry Problem | Soleos Solution |
|---|---|---|
| Land Title Disputes | 40% of projects face title challenges post-construction | 30-year title search, title insurance, escrow-based payments |
| Permit Delays | 12-18 months average for all approvals | Parallel processing achieves 6-9 months with 98% success |
| Grid Rejection | 30% of STU applications rejected or delayed | Pre-feasibility studies and early STU engagement |
| Offtake Uncertainty | Construction starts with unsigned PPAs | 100% contracted with payment security before handover |
| Cost Overruns | Development costs escalate due to delays | Fixed development fee with milestone-based payments |
Geographic Presence
Where We Develop
Active development capabilities across high-potential renewable energy markets.
India
Primary development hub
Africa
Emerging markets expansion
Europe
Strategic partnerships
Asia-Pacific
Market entry
Americas
Growth market
Our Track Record
Development Portfolio
Proven delivery across markets with projects completed and actively under development.
Development Completed
Chhattisgarh, India
Solar30 MW
Gujarat (Mehsana), India
Solar30 MW
DRC (Lubumbashi)
Solar + Storage248 MW + 50 MW BESS
Spain (Seville)
Solar + Storage50 MW + 80 MW BESS
Under Development
Maharashtra (Sangli), India
Solar214 MW
Gujarat (Kutch), India
Solar100 MW
Bihar (Gaya), India
Solar84 MW
Zimbabwe (Bulawayo & Harare)
Solar130 MW
Philippines (Murcia)
Solar95 MW
Spain (Seville)
Solar + Storage50 MW + 80 MW BESS
Brazil (Bahia)
Solar308 MW
Pipeline data as of January 2026. Contact us for current project availability and partnership opportunities.